TR07
Home Up TR07 TR08 Maintenance Track Equipment

 

Nederlandse Site

NY Signal drawn by 3rd PlanIt

TrackPlanning.com

NY Signal drawn 
with
3rd PlanIt by Walter Griffin

Click to subscribe to 3rd PlanIt


As we walk up to the TR07, we can see it parked on a spur for the time being.

In fact, the unit is on one of three tracks served by a large transfer table.

Details of the front section come into view.

Peeking under the front fairing, we can see the magnetic support assembly as it enters the train.

This is a view of the far side of the track... the inside of the magnetic units.

Can anyone say "High Current"?

Two panels near one end are open for inspection.

Details within the open sections


Looking back into the sun at the two open panels.

A wide-angle view of the TransRapid transfer table.



Up Next

 

Send mail to webmaster@TrackPlanning.com with questions or comments about this web site.
Copyright © 1999-2003 El Dorado Software
Last modified: October 01, 1999